Saturday, December 15, 2018

HVAC System Engineering Feasibility Study (Old main)



File Size: 7.20 mb

Description
A preliminary site visit to Old Main for the purpose of observing the extent of the existing mechanical HVAC systems and equipment in order to gain visual knowledge of the age, condition, and overall functioning state of the system as it currently operates. 


Content:-
1. Executive summery
2. Introduction/Background 
3. Existing Conditions/Lode Study
4. Discussion/Building System Requirements
5. Analysis And Recommendations
6. Feasibility/Implementation
7. Budget/Cost Implications
8. Conclusion
APPENDICES
A. Option 2 VAV Zoning Plans
B. Block Load Data
C. Sample Equipment Submittals




Download Drive-1

You May Also Like:-

No comments:

Post a Comment