Description
•Provision of investment grade energy assessment for water-cooled chiller plant for energy and water conservation.
•Design and install capital improvements for water-cooled chiller plant that reduces energy and water consumption and related costs.
•Project commissioning.
•Measurement and verification of the post-retrofit operations of the improvements.
•Guarantee level of system efficiency.
•Design and install capital improvements for water-cooled chiller plant that reduces energy and water consumption and related costs.
•Project commissioning.
•Measurement and verification of the post-retrofit operations of the improvements.
•Guarantee level of system efficiency.
Content:-
•Objective and scope of GESP
•Background of the Environment Building and water-cooled chiller plant
•Overview of water-cooled chiller plant before and after retrofit works
•Case Studies:
•Background of the Environment Building and water-cooled chiller plant
•Overview of water-cooled chiller plant before and after retrofit works
•Case Studies:
•Guaranteed chilled water plant system efficiency of 0.60 kW/RT at zero tolerance