Sunday, February 3, 2019

Advanced Amine Process Technology Operations and Results from Demonstration Facility at EDF Le Havre


File Size: 1.57 Mb

Description
Alstom Power and The Dow Chemical Company have jointly developed an Advanced Amine Process (AAP) with UCARSOL™ FGC-3000 amine solvent for the capture of CO2 from fossil fuel power plant-generated flue gas. This paper reviews both the test program experience and the results obtained from a completed demonstration unit test campaign at Électricité de France’s (EDF) plant in Le Havre, France. This project was conducted from the beginning of 2010 to the summer of 2014, with the support from the French Environment and Energy Management Agency, ADEME as per its French acronym. This CO2 capture unit demonstrates the commitment of the respective companies to reduce the energy consumption associated with the capture of this greenhouse gas.

Content:-
1. Introduction
2. Test Program and Objectives
3. Results and Discussion
4. Summary
References

Author Details 
"Barath Baburaoa"

"Steve Bedella"

"Paula Restrepoa"

"David Schmidta"

"Craig Schubertb"

"Bruce DeBoltb"

"Islem Hajic"

"Fabrice Chopinc "




Download Drive-1