Saturday, December 29, 2018

YORK: CHILLER REPLACEMENT CONTRACTORS GUIDE


File Size: 12.55 mb

Description
With more than 130 years’ experience in heating, ventilation, air-conditioning, and refrigeration (HVAC&R) product and services, YORK’s array of air conditioners provides the ultimate comfort for your home and office by creating a cool, quiet and dry living environment.

YORK was established in 1874 in York, Pennsylvania, and has gone on to claim several significant firsts in design and innovation over the years. Now a Johnson Controls brand, YORK® leverages on its deep understanding of temperature control and heritage of cutting-edge research to provide the best temperature control solutions available around the world today. Explore our range of air-conditioning products to meet the needs of your home and office.


Installation Check List:
The following items must be checked before placing the units in operation.
1. Inspect the unit for shipping damage.
2. Rig Unit using spreader bars.
3. Open the unit only to install water piping system. Do not remove protective covers from water connections until piping is ready for attachment. Check water piping to ensure cleanliness.
4. Pipe unit using good piping practice (see ASHRAE handbook section 215 and 195).
5. Check to see that the unit is installed and operated within limitations (Refer to Operational and Voltage Limitations located in Section 1 of the YCAL Operations and Maintenance Guide [Form 150.62-NM8]).






Download Drive-1

You May Also Like:-

No comments:

Post a Comment